SLVSBD1B December 2012 – August 2025 TPS65175
PRODUCTION DATA
As the gamma buffer channels are supplied by the boost converter output rail, they are following ratio-metrically the VDD voltage from power-on till power-down and start together with the boost converter after the DLY2 has passed. See the Appendix section to set the DLY2 timing.