SLVSBD1B December 2012 – August 2025 TPS65175
PRODUCTION DATA
The positive charge pump controller as well as the push-pull stage on SWP pin are enabled when the boost and synchronous buck converters’ power good signals are asserted and that the DLY3 has passed. See the Appendix section to set the DLY3 timing.