6 Revision History
Changes from Revision * (December 2023) to Revision A (July 2025)
- Updated the numbering format for tables, figures, and cross-references throughout the document. Updated overall structure of the document to improve readability.Go
- Added Power Supply Ramp Sequence Check Section.Go
- Added Section 2.2.1.1
Go
- Added Probe the RBIAS pin Section. Updated RBIAS to 1V from 2.7V.Go
- Added Section 2.3.1
Go
- Updated MSE Link Quality Ranges table from decimal to hex.Go
- Added Compliance Section.Go
- Added RMII Check SectionGo
- Added Transmitting and Receiving Packets With the MAC
sectionGo
- Added Summary sectionGo