ZHCSE15F July 2015 – May 2018 SN65DP159 , SN75DP159
PRODUCTION DATA.
SNx5DP159 starts to operate after the OE signal goes high (see Figure 22, Figure 23, and Table 1). Keeping OE low until VDD and VCC become stable avoids any timing requirements as shown in Figure 22.
Figure 23. CDR Timing for SNx5DP159