ZHCSPW5C September 2022 – October 2025 TPSM365R3 , TPSM365R6
PRODUCTION DATA
除非另有指明,否則 VIN = 24V、VOUT = 5V、IOUT = 0.5A 且 FSW = 1MHz
| VIN = 24V | VOUT = 5V |
| VIN = 24V | VOUT = 3.3V | FSW = 1MHz |
| COUT = 2 × 22μF |
| VIN = 24V | VOUT = 5V | FSW = 1MHz |
| COUT = 2 × 22μF |
圖 8-9 熱像圖,VIN = 24V,VOUT = 12V,F(xiàn)SW = 2.2MHz,IOUT = 0.6A(標(biāo)準(zhǔn) EVM 和 BOM)| VIN = 24V | VOUT = 5V | fSW = 1MHz |
| 負(fù)載 = 500 mA |
| VIN = 24V | VOUT = 5V | fSW = 1MHz |
| 負(fù)載 = 500 mA |
| VIN = 24V | VOUT = 5V |
| VIN = 24V | VOUT = 3.3V | FSW = 1MHz |
| COUT = 2 × 22μF |
| VIN = 24V | VOUT = 5V | FSW = 1MHz |
| COUT = 2 × 22μF |
圖 8-10 熱像圖,VIN = 24V,VOUT = 5V,F(xiàn)SW = 1MHz,IOUT = 0.6A(標(biāo)準(zhǔn) EVM 和 BOM)| VIN = 24V | VOUT = 5V | fSW = 1MHz |
| 負(fù)載 = 500 mA |