Free-air room temperature 25°C (unless otherwise noted) Measurements were made using TAS5825PEVM board and Audio Precision System 2722 with Analog Analyzer filter set to 20-kHz brickwall filter. All measurements taken with audio frequency set to 1 kHz and device PWM frequency set to 768 kHz, the LC filter used was 4.7 μH / 0.68 μF (Pre-Filter PBTL, the merging of the two output channels in this device can be done before the inductor portion of the output filter, see details in Section 10.2.6), unless otherwise noted.

|
BD
Modulation |
PO =
1W,2.5W,5W |
| FSW =
768 kHz |
Load = 3
Ω |
PBTL Mode |
Figure 7-72 THD+N vs Frequency-PBTL
|
BD
Modulation |
PO =
1W,2.5W,5W |
| FSW =
768 kHz |
Load = 3
Ω |
PBTL Mode |
Figure 7-74 THD+N vs Frequency-PBTL
|
BD
Modulation |
PO =
1W,2.5W,5W |
| FSW =
768 kHz |
Load = 3
Ω |
PBTL Mode |
Figure 7-76 THD+N vs Frequency-PBTL
|
BD
Modulation |
|
| FSW =
768 kHz |
Load = 3 Ω, 4
Ω |
PBTL Mode |
Figure 7-78 THD+N vs Output Power-PBTL
|
BD
Modulation |
|
| FSW =
768 kHz |
Load = 3 Ω, 4
Ω |
PBTL Mode |
Figure 7-80 THD+N vs Output Power-PBTL
|
BD
Modulation |
|
| FSW =
768 kHz |
Load = 4
Ω |
PBTL Mode |
Figure 7-82 Output Power vs Supply Voltage
| BD Modulation | |
| FSW = 768 kHz | Load = 3 Ω, PBTL | |
| 5 V EVM Battery with default PPC3 setting
(-5.5 dB AGAIN) |
Figure 7-84 Efficiency vs Output Power
|
BD
Modulation |
|
| FSW =
384 kHz Load=4Ω, PBTL |
5 V Battery Input
approximately 5 V – 16 V Boost |
Default PPC3
Setting (-5.5 dB AGAIN) |
Figure 7-86 EVM Efficiency Comparison ON/OFF Hybrid-Pro
|
BD
Modulation |
PO =
1W,2.5W,5W |
| FSW =
768 kHz |
Load = 4
Ω |
PBTL Mode |
Figure 7-73 THD+N vs Frequency-PBTL
|
BD
Modulation |
PO =
1W,2.5W,5W |
| FSW =
768 kHz |
Load = 4
Ω |
PBTL Mode |
Figure 7-75 THD+N vs Frequency-PBTL
|
BD
Modulation |
PO =
1W,2.5W,5W |
| FSW =
768 kHz |
Load = 4
Ω |
PBTL Mode |
Figure 7-77 THD+N vs Frequency-PBTL
|
BD
Modulation |
|
| FSW =
768 kHz |
Load = 3 Ω, 4
Ω |
PBTL Mode |
Figure 7-79 THD+N vs Output Power-PBTL
|
BD
Modulation |
|
| FSW =
768 kHz |
Load = 3
Ω |
PBTL Mode |
Figure 7-81 Output Power vs Supply Voltage
|
BD
Modulation |
|
| FSW =
768 kHz |
Load = 3
Ω |
PBTL Mode |
Figure 7-83 Efficiency vs Output Power
|
BD
Modulation |
|
| FSW =
384 kHz Load=3Ω, PBTL |
5 V Battery Input
approximately 5 V – 16 V Boost |
Default PPC3
Setting (-5.5 dB AGAIN) |
Figure 7-85 EVM Efficiency Comparison ON/OFF Hybrid-Pro
|
BD
Modulation |
|
| FSW =
768 kHz |
Load =4Ω |
PBTL Mode |
Figure 7-87 Idle Channel Noise vs Supply Voltage