ZHCSIM4H April 2009 – November 2014 LM25011 , LM25011-Q1
PRODUCTION DATA.
The SS pin can be used to shutdown the LM25011 by grounding the SS pin as shown in Figure 18. Releasing the pin allows normal operation to resume.
Figure 18. Shutdown Implementation