SNOU187 September 2021
To verify the startup behavior, connect the oscilloscope to the evaluation module:
Figure 5-2 Power Up: GATE and PD
Figure 5-3 Power Up: Charge Pump and Inrush CurrentAdditional startup information is captured in Figure 5-3. Channel 3 captures the internal boost converter output voltage VCAP pin during startup.