SNIU033 May 2019 TMP390
Figure 6. TMP390 Evaluation Board Schematic | Item No. | Qty | Value | Ref Des | Description | Vendor/Mfr | Part Number |
|---|---|---|---|---|---|---|
| 1 | 1 | 10 µF | C1 | CAP, CERM, 10 µF, 10 V, ±20%, X5R, 0603 | TDK | C1608X5R1A106M080AC |
| 2 | 1 | 2.2 µF | C2 | CAP, CERM, 2.2 µF, 16 V, ±10%, X5R, 0402 | MuRata | GRM155R61C225KE11D |
| 4 | 2 | 0.1 µF | C7, C8 | CAP, CERM, 0.1 µF, 25 V, ±10%, X8R, AEC-Q200 Grade 0, 0603 | TDK | CGA3E2X8R1E104K080AA |
| 5 | 1 | 6.2 V | D1 | Diode, Zener, 6.2 V, 300 mW, SOD-523 | Diodes Inc. | BZT52C6V2T-7 |
| 6 | 2 | Green | D2, D4 | LED, Green, SMD | Lumex | SML-LX0603GW-TR |
| 7 | 1 | Red | D3 | LED, Red, SMD | Lite-On | LTST-C191KRKT |
| 8 | 1 | J1 | Header, 2.54 mm, 2x1, Gold, TH | Wurth Elektronik | 61300211121 | |
| 9 | 1 | J2 | Connector, Plug, USB Type A, R/A, Top Mount SMT | Molex | 48037-2200 | |
| 10 | 1 | 120 | L1 | Ferrite Bead, 120 Ω at 100 MHz, 0.55 A, 0402 | MuRata | BLM15AG121SN1D |
| 11 | 1 | 47 | R1 | RES, 47, 5%, 0.1 W, AEC-Q200 Grade 0, 0402 | Panasonic | ERJ-2GEJ470X |
| 12 | 3 | 1k | R2, R11, R12 | RES, 1.0 kΩ, 5%, 0.1 W, AEC-Q200 Grade 0, 0402 | Panasonic | ERJ-2GEJ102X |
| 13 | 1 | 5.90k | R3 | RES, 1 KΩ, 1%, 0.1 W, AEC-Q200, 0603 | Panasonic | ERJ-3EKF1001V |
| 14 | 1 | 10.5k | R5 | RES, 10.5 k, 1%, 0.1 W, 0603 | Vishay-Dale | CRCW060310K5FKEA |
| 15 | 1 | 0 | R7 | RES, 0, 5%, 0.063 W, AEC-Q200 Grade 0, 0402 | Vishay-Dale | CRCW04020000Z0ED |
| 16 | 2 | 10k | R8, R10 | RES, 10 kΩ, 5%, 0.1 W, AEC-Q200 Grade 0, 0402 | Panasonic | ERJ-2GEJ103X |
| 17 | 2 | S1, S2 | Switch, SPST-NO, Off-Mom, 0.05A, 12VDC, SMD | C&K Components | PTS820 J20M SMTR LFS | |
| 18 | 1 | SH-J1 | Shunt, 100mil, Tin plated, Black | Samtec | SNT-100-BK-T-H | |
| 19 | 5 | TP1, TP2, TP3, TP4, TP5 | Natural PC Test Point Brass, SMT | Harwin | S2761-46R | |
| 20 | 1 | U1 | Single Output LDO, 200 mA, Fixed 3.3 V Output, 2 to 5.5 V Input, with Low IQ | Texas Instruments | TLV70033DCKR | |
| 21 | 1 | U2 | Dual-Trip, Resistor-Programmable Temperature Switch | Texas Instruments | TMP390A2DRLR | |
| 22 | 1 | U3 | Dual Buffer/Driver With 3-State Outputs | Texas Instruments | SN74LVC2G240DCUR | |
| 23 | 0 | J3 | Header, 100 mil, 6x2, Gold, TH | Samtec | TSW-106-07-G-D | |
| 24 | 0 | 5.90k | R4 | RES, 1 KΩ, 1%, 0.1 W, AEC-Q200, 0603 | Panasonic | ERJ-3EKF1001V |
| 25 | 0 | 10.5k | R6 | RES, 10.5 k, 1%, 0.1 W, 0603 | Vishay-Dale | CRCW060310K5FKEA |
| 26 | 0 | 0 | R9 | RES, 0, 5%, 0.063 W, AEC-Q200 Grade 0, 0402 | Vishay-Dale | CRCW04020000Z0ED |